Well, once again, time has flown and I have no idea where it went.
Once the roof was done, the hvac went in, followed by plumbing. Plumbing should have finished on 6/29, and electrical should have started.
On Thursday, June 29, I had my pre-drywall inspection. It went well. I verified all the locations for my extra outlets and ceiling fan rough ins. I also met with guardian to verify data and cable drops, as well as the location of my media enclosure in the basement. Additionally, also had a professional inspection done to the tune of $450. Fortunately, he didn’t find a whole lot. Some minor wrap repairs that need to happen, and some staples/nails improperly done. Should be easy fixes.
Should be putting up drywall week after next!
Hmm.. I need to create a timeline for all this stuff.